11/06/2012
today i did hip rafters. each rafer had to be put in accuratly we started by putting in the premade rafers tht were already nailed together. once we had them sitting in place we nailed the bottom on the rafter in an then level the rafter an nailed the top. once all the rafters were in we had to nail plate the hip rafter together becasue the timber was to short. once both sides hip rafters were nailed in it was the end of the day
hand tools used: full apron hammer rule etc level string line.
power tools used: nail gun
No comments:
Post a Comment