Monday 28 May 2012

29/5/2012

frame construction

today we just carryed on from last week with straitening the frames we stood. my job was to measure the intreanl frames an make sure thay were all paralell. after plumbing the frames noticed that none of them were paralell so i got my tape an hooked it over the external frame and did a running measurement along with the plans i moved the frames to where thy were ment to be working from 1 end to the other end. i then moved across to the hall way side of the room and did the same measurements. i then got the 30m tape and did an overall measurement and referd to the plans to see if i was close to where i was supose to be.

hand tools used

hammer
30m tape
8m tape
level
straight edge